Formula
Cost = (area ÷ production) × labor + chemical allowance.
Orifice = GPM × √(4,000 ÷ PSI). The pressure washer nozzle calculator uses that orifice number. Round to a tip you can buy.
Apply for financingPressure wash
This pressure washing cost calculator divides the area by square feet per hour and multiplies by your labor price, then adds a chemical allowance. The pressure washing calculator is that job estimate. The pressure washer nozzle calculator is the orifice number: flow times the square root of 4,000 divided by the pressure. Prices and production are estimates you enter.
Job estimate
$320.00
Planning estimate from the numbers you enter. Coverage, density, waste and price are assumptions, not a supplier quote or an engineering specification.
How it works
Two thousand square feet at 500 square feet per hour is 4.00 hours. At $75 per hour the labor is $300. A $20 chemical allowance makes the job $320. A 4 gallon per minute washer at 3,000 psi needs an orifice of 4.62. The orifice formula is gallons per minute times the square root of 4,000 divided by psi. It picks a tip size to match the pump, not a surface cleaner width. Production of 500 square feet per hour is a placeholder. Concrete, wood, and a second story do not share a rate. Type the rate your crew hits.
Formula
Orifice = GPM × √(4,000 ÷ PSI). The pressure washer nozzle calculator uses that orifice number. Round to a tip you can buy.
Example
The pressure washing cost calculator shows 4.00 hours and $320. The orifice is 4.62. A 4.5 tip is the nearby size. The page shows the calculated number, not a catalog tip.
Tips
A tip that is too large makes the pump work at a lower pressure. A tip that is too small deadheads the pump. The pressure washing calculator's dollars do not know that. The orifice line does.
Equipment
Dengaro arranges financing for a pressure washer. The job price is not a loan amount.
Important questions
No. It is an example. The pressure washing cost calculator multiplies the price you type.
It is the industry tip size for that flow and pressure. A result of 4.62 points at a 4.5 or a 5 tip. Check the tip chart that came with the tips.
Only if your production rate includes it. A pure spraying rate will understate the time on a job with a long hose pull. Lower the production number.
No. It is the separate allowance. Set it to zero if the labor price already includes soap.
Financing built into the sale